NORWAY · WELLBORES · NPDID 6593

16/1-15 A

Exploration · Appraisal · P&A · Oil · Lundin Norway AS · Edvard Grieg · PL 338

2 documents: reports, logs, and plots →

16/1-15 A is an appraisal exploration wellbore in the North Sea, drilled by Lundin Norway AS, entered Apr 6, 2011, to 2,175 m in the Basement.

Discovery 16/1-8 Edvard Grieg · On the map →

2,175
m total depth · 2,011 m vertical
111
m water depth
Apr 6, 2011
entered · completed May 13, 2011
Basement
at total depth · Pre-Devonian
10.3
m of core in 4 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAY 13, 2013

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
BREDFORD DOLPHIN · Semisub steel
Drilling days
38
Kelly bushing elevation
25 m
Maximum inclination
34.5°
Drilling permit
1354-L
Licensing round
TFO2004
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.87328° N, 2.26147° E
Hydrocarbons in
Intra Åsgard Fm Ss · Early Cretaceous
Hydrocarbons in
Basement · Pre-Devonian

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 16/1-15A is a sidetrack to Well 16/1-15, drilled on the western side of the Utsira High in the North Sea. The primary well proved Tellus to be a continuation of the Luno Discovery, now officially named the Edvard Grieg Field. The objectives of the geological sidetrack, 16/1-15 AT2, were to prove thicker, high productivity sandstone sequences to add to the Luno reserves, and to provide seismic calibration of complex stratigraphy.

Operations and results

Appraisal well 16/1-15 A was kicked off at 599 m in well 16/1-15 on 6 April 2011. It was drilled with the semi-submersible installation Bredford Dolphin. The 12 1/4" hole was drilled to TD at 2041 m. When running 9 5/8" casing it got differentially stuck forcing a new sidetrack. It is believed that the casing stuck in Grid Formation sandstone. The 16/1-15 A well bore was thus plugged back to the 20" casing and the technical sidetrack 16/1-15 AT2 was kicked off from 584 m and drilled to final TD at 2175 m (2011 m TVD) in Basement rocks. The sidetrack was drilled with Performadril mud from kick-off to TD.

Well 16/1-15 AT2 proved 1 meter thick Intra Åsgard Formation Sandstone at 2067 m, overlying fractured basement. The sandstone was oil bearing and the basement had shows, but in this well bore the basement was found to be cemented and was considered unproductive. Oil shows were first recorded on the cores in the Intra Åsgard Formation Sandstone. They continued on the cores into the underlying basement where they were generally restricted to fractures. Below the cored interval sporadic shows were seen on cuttings down to a depth of 2124 m (1967.6 m TVD).

Four short cores were cut from 2066 to 2076.26 m, across

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6593, documented in the API reference.