NORWAY · WELLBORES · NPDID 6599

35/7-1 S

Exploration · Wildcat · P&A · Dry · Idemitsu Petroleum Norge AS · PL 377 S

3 documents: reports, logs, and plots →

35/7-1 S is a wildcat exploration wellbore in the North Sea, drilled by Idemitsu Petroleum Norge AS, entered May 13, 2011, to 4,825 m in the Amundsen Fm.

On the map →

4,825
m total depth · 4,813 m vertical
386
m water depth
May 13, 2011
entered · completed Aug 15, 2011
Amundsen Fm
at total depth · Early Jurassic
—
m of core
168
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED AUG 15, 2013

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
AKER BARENTS · Semisub steel
Drilling days
95
Kelly bushing elevation
40 m
Maximum inclination
9.19999981°
Drilling permit
1356-L
Licensing round
TFO2005
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.36079° N, 3.21992° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 35/7-1 S was drilled on the Apollon prospect on the Marflo Spur, west of the Vega Field in the Northern North Sea. The main objective for the well was to test the hydrocarbon potential in Tarbert, Ness and Etive formations sandstones of the Middle Jurassic Brent Group. The secondary objective was to prove hydrocarbons in the Lower Jurassic Cook Formation within the Dunlin Group. The well was designed with an S-shaped path to avoid a possible gas charged sand.

Operations and results

Well 35/7-1 S was spudded with the semi-submersible installation Aker Barents on 13 May 2011. A 9-7/8" pilot hole was drilled below the 30" casing shoe to section TD at 1414 m to check for shallow gas. No shallow gas was recorded. Severe mud losses were experienced when drilling the 17-1/2" section in the transition from Balder to Sele formations at 1855 m. Decision was made to plug back the existing 17-1/2" section and sidetrack the well from below the 20" casing shoe, at 1425 m. When the 12 1/4" section was drilled to just above prognosed section TD, an influx of 400 l was reported and the well shut-in. The well kill with 10 SPM was performed and was successful. This was however an extremely slow rate to kill such a long well and required an extensive amount of time. After the well kill, the 9 7/8" casing was run and cemented and the 35/7-1 ST2 technical sidetrack was drilled on without significant problems to TD at 4825 in the Early Jurassic Amundsen Formation. The well was drilled with seawater and hi-vis pills down to 511 m, with Glydril/KCl mud from 511 m to 1414 m in the primary well and to 1417 m in the sidetrack, with Versatec oil based mud from 1417 m to 3736 m and with Versatherm OBM from 3736 m to TD.

<span lang=

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6599, documented in the API reference.