NORWAY · WELLBORES · NPDID 6613

1/3-A-2 H

Development · Production · P&A · Oil · DONG E&P Norge AS · Oselvar · PL 274

1/3-A-2 H is a production development wellbore in the North Sea, drilled by DONG E&P Norge AS, entered Nov 18, 2011, to 5,882 m.

Discovery 1/3-6 Oselvar · On the map →

5,882
m total depth · 3,170 m vertical
72
m water depth
Nov 18, 2011
entered · completed Jan 19, 2012
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JAN 19, 2014

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
MÆRSK GIANT · Jack-up 3 legs
Drilling days
63
Kelly bushing elevation
45 m
Maximum inclination
—°
Drilling permit
3366-P
Licensing round
NST2001
Plugged and abandoned
Aug 5, 2021
Core samples available
No
Cuttings samples available
No
Position · ED50
56.93191° N, 2.67130° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6613, documented in the API reference.