NORWAY · WELLBORES · NPDID 6648
6407/5-2 S
Exploration · Wildcat · P&A · Gas · OMV (Norge) AS · PL 471
6407/5-2 S is a wildcat exploration wellbore in the Norwegian Sea, drilled by OMV (Norge) AS, entered Jul 28, 2011, to 3,545 m in the Tilje Fm.
Discovery 6407/5-2 S (Cortina) · On the map →
- 3,545
- m total depth · 3,390 m vertical
- 230
- m water depth
- Jul 28, 2011
- entered · completed Sep 4, 2011
- Tilje Fm
- at total depth · Early Jurassic
- 27.8
- m of core in 1 core
- 133
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED SEP 4, 2013
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- BORGLAND DOLPHIN · Semisub steel
- Drilling days
- 39
- Kelly bushing elevation
- 31 m
- Maximum inclination
- 37.09999847°
- Drilling permit
- 1363-L
- Licensing round
- TFO2007
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 64.58021° N, 7.61998° E
- Hydrocarbons in
- Rogn Fm · Late Jurassic
- Hydrocarbons in
- Garn Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6407/5-2 S was drilled on the eastern side of the Gimsan Basin on the Halten Terrace in the Norwegian Sea. Nearest discoveries are the Mikkel Sør gas wells, 2-3 km to the east. The main objective of the well was to drill and evaluate the Late Cretaceous Lysing Formation in the Chamonix Prospect. The deeper Jurassic reservoirs of the Garn, Ile, Tofte and Tilje Formations were seen as secondary targets.
Operations and results
Due to presence of cold water corals and sponges in the region, identified during the site survey, the spud location for Chamonix was moved 500m SE from its original planned position. This prevented any negative effects on the cold-water corals and sponges during anchor laying and drilling operations. In order to penetrate all targets vertically, the well was drilled with an S-shaped trajectory.
Wildcat well 6407/5-2 S was spudded with the semi-submersible installation Borgland Dolphin on 28 July 2011 and drilled to TD at 3545 m in the Early Jurassic Tilje Formation. Due to potential shallow gas a 9 7/8" pilot hole was drilled from 332 m to 545 m. No shallow gas was observed. No significant problem was encountered in the operations. The well was drilled with spud mud down to 545 m and with Carbo-Sea synthetic oil-based mud from 545 m to TD.
No movable hydrocarbons were discovered in the prognosed Late Cretaceous Lysing Formation. Post-well biostratigraphic evaluation of the well assigned these sand intervals to the Lange Sandstone Member. A non commercial gas discovery was made in Jurassic sandstones where a ca 40 m gross gas column was penetrated from top Rogn Formation at 3109.5 m (2986.4 m TVD), through a thin Melke Formation sandstone and
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/6648, documented in the API reference.