NORWAY · WELLBORES · NPDID 672
2/4-K-13
Development · Injection · Plugged · Water · Phillips Petroleum Company Norway · Ekofisk · PL 018
2/4-K-13 is an injection development wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Dec 6, 1984, to 3,355 m.
Discovery 2/4-2 Ekofisk · On the map →
- 3,355
- m total depth · 3,249 m vertical
- 71
- m water depth
- Dec 6, 1984
- entered · completed May 26, 1985
- —
- at total depth
- 88.4
- ft of core in 23 cores
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED MAY 26, 1987
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- DYVI BETA · Jack-up 3 legs
- Drilling days
- 172
- Kelly bushing elevation
- 57 m
- Maximum inclination
- —°
- Drilling permit
- 288-P
- Licensing round
- 1-A
- Plugged and abandoned
- Jan 28, 2013
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 56.56558° N, 3.20641° E
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/672, documented in the API reference.