6507/7-15 S is a wildcat exploration wellbore in the Norwegian Sea, drilled by RWE Dea Norge AS, entered Jan 9, 2012, to 4,567 m in the Tilje Fm.

Discovery 6507/7-15 S Dvalin · On the map →

4,567
m total depth · 4,552 m vertical
399
m water depth
Jan 9, 2012
entered · completed May 2, 2012
Tilje Fm
at total depth · Early Jurassic
111.2
m of core in 3 cores
165
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAY 2, 2014

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST ALPHA · Semisub steel
Drilling days
115
Kelly bushing elevation
18 m
Maximum inclination
11.89999962°
Drilling permit
1380-L
Licensing round
TFO2006
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
65.42550° N, 7.09892° E
Hydrocarbons in
Fangst Gp · Middle Jurassic
Hydrocarbons in
Tilje Fm · Early Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6507/7-15 S was drilled on the Zidane West prospect between the Heidrun Field and the 6506/6-1 Bella Donna discovery in the Haltenbanken area of the Norwegian Sea. The primary target was the Middle Jurassic Fangst Group; Garn and Ile Formations. Secondary target levels were the Lower Cretaceous Lange Formation sandstone and the

Lower Jurassic Tilje Formation.

Operations and results

Wildcat well 6507/7-15 S was spudded with the semi-submersible installation West Alpha on 9 January 2012 and drilled to TD at 4567 m (4552 m TVD) in the Early Jurassic Tilje Formation. A 9 7/8" shallow gas pilot hole was drilled from 496 m to 649 m and shallow gas was observed at 640 - 644 m. The 26" hole was drilled to 596 m and the 20" casing was set at 594 m, above the shallow gas zone. Operations were stopped at 4124 m after setting of 9 5/8" casing due to leakage in the kill line and failure on a fail-safe valve. The well was plugged and the BOP was pulled, repaired and run again. Otherwise, operations went forth without significant problems. The well was drilled with seawater, bentonite and hi-vis sweeps down to 596 m, with KCl/freshwater dilution mud from 596 m to 1336 m, with Glydril mud from 1336 m to 2210 m, and with Versatherm oil based mud from 2210 m to TD

The well encountered gas in the Lange, Garn, Ile and Tilje Formations. The Lange Formation had gas in a sandy interval from 3586.5 m (3585.5 m TVD) down to 3634 m (3632.5 m TVD) and water up to 3679.5 m (3677.5 m TVD) based on logs. Pressure testing was difficult due to poor reservoir conditions, so no conclusive gas gradient could be established. The Fangst Group contained gas from top Garn at 4266.5 m (4255

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6730, documented in the API reference.