NORWAY · WELLBORES · NPDID 6784
31/5-I-12 AY1H
Development · Production · Plugged · Oil · Statoil Petroleum AS · Troll · PL 085
31/5-I-12 AY1H is a production development wellbore in the North Sea, drilled by Statoil Petroleum AS, entered Feb 26, 2012, to 5,683 m.
Discovery 31/2-1 (Troll Vest) · On the map →
- 5,683
- m total depth · 1,579 m vertical
- 317
- m water depth
- Feb 26, 2012
- entered · completed Mar 24, 2012
- —
- at total depth
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED MAR 24, 2014
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- SONGA TRYM · Semisub steel
- Drilling days
- 28
- Kelly bushing elevation
- 25 m
- Maximum inclination
- —°
- Drilling permit
- 3438-P1
- Licensing round
- Awarded additionally to round 7
- Plugged and abandoned
- Oct 31, 2020
- Core samples available
- No
- Cuttings samples available
- No
- Position · ED50
- 60.74097° N, 3.58179° E
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/6784, documented in the API reference.