NORWAY · WELLBORES · NPDID 6785

31/5-I-12 AY2H

Development · Production · Plugged · Oil · Statoil Petroleum AS · Troll · PL 085

31/5-I-12 AY2H is a production development wellbore in the North Sea, drilled by Statoil Petroleum AS, entered Mar 25, 2012, to 6,250 m.

Discovery 31/2-1 (Troll Vest) · On the map →

6,250
m total depth · 1,575 m vertical
317
m water depth
Mar 25, 2012
entered · completed Apr 16, 2012
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED APR 16, 2014

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SONGA TRYM · Semisub steel
Drilling days
23
Kelly bushing elevation
25 m
Maximum inclination
—°
Drilling permit
3438-P2
Licensing round
Awarded additionally to round 7
Plugged and abandoned
Oct 31, 2020
Core samples available
No
Cuttings samples available
No
Position · ED50
60.74097° N, 3.58179° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6785, documented in the API reference.