NORWAY · WELLBORES · NPDID 6823
16/1-16
Exploration · Wildcat · P&A · Oil · Wintershall Norge ASA · Ivar Aasen · PL 457
16/1-16 is a wildcat exploration wellbore in the North Sea, drilled by Wintershall Norge ASA, entered Oct 23, 2012, to 2,722 m in the Rotliegend Gp.
Discovery 16/1-9 Ivar Aasen · On the map →
- 2,722
- m total depth · 2,721 m vertical
- 113
- m water depth
- Oct 23, 2012
- entered · completed Dec 7, 2012
- Rotliegend Gp
- at total depth · Permian
- 55.7
- m of core in 3 cores
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED DEC 7, 2014
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- BREDFORD DOLPHIN · Semisub steel
- Drilling days
- 46
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 2.5999999°
- Drilling permit
- 1391-L
- Licensing round
- TFO2007
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.91327° N, 2.26517° E
- Hydrocarbons in
- Hugin Fm · Middle Jurassic
- Hydrocarbons in
- Skagerrak Fm · Triassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 16/1-16 was drilled on the east side of the Gudrun Terrace towards the Utsira High in the North Sea. The main objectives were to test the hydrocarbon potential in Late Jurassic/Early Cretaceous sands (the Noor prospect), and to appraise the extension of the Ivar Aasen Field of Middle Jurassic/Triassic age into PL457 area (Asha prospect). A possible secondary target at Paleocene level is the Heimdal sand pinchout. The well was planned to drill into Zechstein carbonates that may act as reservoir in this area.
Operations and results
Well 16/1-16 was spudded with the semi-submersible installation Bredford Dolphin on 23 October 2012 and drilled to TD at 2722 m in the Permian Rotliegend Group. A 9 7/8” pilot hole was first drilled to 600 m to check for shallow gas. No shallow gas was observed. Operations proceeded without significant problems. The well was drilled with
No significant problem was encountered in the operations. The well was drilled with seawater and hi-vis sweeps down to 592 m and with water based Performadril mud from 592 m to TD.
The interpreted Heimdal Formation sand reservoir was absent. The Lista Formation consists predominantly of Claystone with Limestone stringers.
In the first main exploration target (Noor prospect), the well penetrated approximately 90 m gross sandstones altogether, but there were no hydrocarbon shows or anomalous gas values seen. The Early Cretaceous Åsgard Formation is a Limestone/Chalk - sandstone sequence, with a predominantly limestone/chalk in the top 50 m and sandstone from 2120 m and towards the base. The Draupne Formation was found as a primarily siltstone sequence
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/6823, documented in the API reference.