NORWAY · WELLBORES · NPDID 6854

6407/8-C-2 AY1H

Development · Production · Closed · Oil · Statoil Petroleum AS · Hyme · PL 348

6407/8-C-2 AY1H is a production development wellbore in the Norwegian Sea, drilled by Statoil Petroleum AS, entered Nov 15, 2012, to 4,430 m.

Discovery 6407/8-5 S Hyme · On the map →

4,430
m total depth · 2,117 m vertical
256
m water depth
Nov 15, 2012
entered · completed Dec 18, 2012
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 7, 2026 · RELEASED DEC 18, 2014

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
SCARABEO 5 · Semisub steel
Drilling days
34
Kelly bushing elevation
25 m
Maximum inclination
—°
Drilling permit
3471-P1
Licensing round
TFO2004
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
64.35816° N, 7.55114° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/6854, documented in the API reference.