16/2-13 A is an appraisal exploration wellbore in the North Sea, drilled by Lundin Norway AS, entered Aug 30, 2012, to 2,776 m in the No Group Defined.
Discovery 16/2-6 Johan Sverdrup · On the map →
- 2,776
- m total depth · 2,102 m vertical
- 116
- m water depth
- Aug 30, 2012
- entered · completed Sep 29, 2012
- No Group Defined
- at total depth · Pre-Permian
- 81.7
- m of core in 4 cores
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED SEP 29, 2014
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- TRANSOCEAN ARCTIC · Semisub steel
- Drilling days
- 33
- Kelly bushing elevation
- 24 m
- Maximum inclination
- 65.30000305°
- Drilling permit
- 1415-L
- Licensing round
- TFO2008
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.83291° N, 2.65287° E
- Hydrocarbons in
- Intra Draupne Fm Ss · Late Jurassic
- Hydrocarbons in
- Hugin Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 16/2-13 A is a geological side track to well 16/2-13 S on the Johan Sverdrup discovery on the Utsira High in the North Sea, 6.7 km northeast of well 16/2-8 and 2.4 km north-east of well 16/2-6. The objective of the side track was to calibrate the depth model in a position far enough away from 16/2-13 S to provide significant information for depth conversion; to investigate if FWL in 16/2-10 is present in area across the fault close to 16/2-13 S and; to map lateral thickness and quality variations in the Jurassic sequence.
Operations and results
Well 16/2-13 A was kicked off at 735 m in 16/2-13 S on 30 August 2012. The semi-submersible installation Transocean drilled the well to TD at 2776 m (2101.7 m TVD) in indeterminate pre-Rotliegend Group rock. The sidetrack was drilled with Enviromul OBM.
The reservoir was encountered at 2596.06 (1926 m TVD) about 1250 metres north of well 16/2-13 S and slightly shallower than prognosis. It consisted of a 26.5 m thick Intra-Draupne, Intra-Heather and Hugin sandstone package, similar as in 16/2-13 S. The oil column in the sidetrack was 12 m and the oil water contact was established at 1949 m TVD (1925 m TVD MSL).
Four cores were cut from 2587.3 m in Draupne Formation shales to 2669.0 m in Pre-Rotliegendes rock. The core to log shift for all four cores is -1.5 m. The core recovery was 100%. RCX wire line fluid samples were taken at 2596.7 m (oil), 2607.5 m (oil), 2608.5 m (oil and water), 2610.7 m (water), and 2615.0 m (water).
The well was permanently abandoned on 29 September 2012 as an oil appraisal.
Testing<span l
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.