NORWAY · WELLBORES · NPDID 7110

6201/11-3 R

Exploration · Wildcat · P&A · Oil · Lundin Norway AS · PL 519

1 document: reports, logs, and plots →

6201/11-3 R is a wildcat exploration wellbore in the Norwegian Sea, drilled by Lundin Norway AS, entered Aug 15, 2012, to 3,000 m in the Zechstein Gp.

Discovery 6201/11-3 R (Albert) · On the map →

3,000
m total depth · 3,000 m vertical
382
m water depth
Aug 15, 2012
entered · completed Oct 20, 2012
Zechstein Gp
at total depth · Permian
48
m of core in 5 cores
115
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED OCT 20, 2014

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
BREDFORD DOLPHIN · Semisub steel
Drilling days
67
Kelly bushing elevation
25 m
Maximum inclination
1.70000005°
Drilling permit
1395-L2
Licensing round
20
Plugged and abandoned
Oct 20, 2012
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
62.04582° N, 1.50363° E
Hydrocarbons in
Kyrre Fm · Late Cretaceous

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6201/11-3 R is a re-entry of well 6201/11-3. The well is located on the Manet Ridge in the northernmost North Sea between the Magnus and Møre Basins. Well 6201/11-3 was suspended at 2120 m before the main target was reached because the certification for the rig expired. The re-entry was done to fulfil the well objectives. The primary objective was to investigate the Albert prospect, a Late Cretaceous succession untested by the neighbouring well 6201/11-1, where Statoil found oil in the Triassic Lunde Formation in 1987. Secondary objectives were sandstones in the Paleocene (reached in the primary entry) and sandstones in the Triassic.

Operations and results

Wildcat well 6201/11-3 was re-entered with the semi-submersible installation Bredford Dolphin on 15 August 2012. The re-entry was drilled from 2120 m to TD at 3000 m in the Late Permian Zechstein Group. The well was drilled with Performadril/GEM mud from Kick-off to TD.

Oil was proven in the uppermost part of the primary target, a 3.5 m thick Kyrre Formation chalk reservoir with top at 2620.8 m. A successful mini-DST proved good hydrocarbon productivity in the chalk formation. The lower Triassic primary objective was found to contain tight sandstone reservoir facies with oil shows.

Five cores were cut in the well. Cores 1 and 2 were cut in the Kyrre Formation in the interval 2621.5 m to 2651.8 m. Cores 3, 4, and 5 were cut in the Lunde Formation in the intervals 2710 m to 2718 m, 2754 m to 2758 m, and 2795 m to 2809.4 m, respectively. Core recoveries varied from 7.5 to 100%. MDT oil samples were acquired at 2621.7 m, 2621.8, and 2624.0 m in the Kyrre Formation. MDT water samples were acquired at 2737.6 m, 2834.4 m, a

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/7110, documented in the API reference.