NORWAY · WELLBORES · NPDID 7123

16/5-3

Exploration · Appraisal · P&A · Oil · Statoil Petroleum AS · Johan Sverdrup · PL 502

1 document: reports, logs, and plots →

16/5-3 is an appraisal exploration wellbore in the North Sea, drilled by Statoil Petroleum AS, entered Feb 20, 2013, to 1,993 m in the Zechstein Gp.

Discovery 16/2-6 Johan Sverdrup · On the map →

1,993
m total depth · 1,993 m vertical
108
m water depth
Feb 20, 2013
entered · completed Mar 20, 2013
Zechstein Gp
at total depth · Permian
27.2
m of core in 1 core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAR 20, 2015

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
OCEAN VANGUARD · Semisub steel
Drilling days
27
Kelly bushing elevation
22 m
Maximum inclination
1.13999999°
Drilling permit
1417-L
Licensing round
TFO2008
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.73165° N, 2.55796° E
Hydrocarbons in
Intra Draupne Fm Ss · Late Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 16/5-3 was drilled on a possible southern extension of the Johan Sverdrup discovery in the North Sea. The main objective was to prove hydrocarbons in Late Jurassic Intra-Draupne Formation sandstone. In case of discovery, it was important to verify the reservoir quality, fluid property, lateral extension and communication with the Johan Sverdrup discovery.

Operations and results

The location for well 16/5-3 was given a shallow gas class 1 warning in an interval between 295 and 422. A pilot hole was drilled (off location), well 16/5-U-1. No shallow gas was observed.

Appraisal well 16/5-3 was spudded with the semi-submersible installation Ocean Vanguard on 20 February 2013 and drilled to TD at 1993 m in the Permian Zechstien Group. A sidetrack 16/5-3 T2 was kicked off from 1774 m in 16/5-3 and drilled as a bypass track in order to perform coring in zone of interest identified in the main wellbore. No significant problem was encountered in the operations. The well was drilled with seawater down to 916 m and with Performadril mud from 916 m to TD. The sidetrack was drilled with Performadril mud with tritium tracer.

The Intra-Draupne Formation sandstone reservoir was entered at 1898 m, which was 38 m shallower than prognosed. The reservoir contained oil down to 1911 m and had a thickness of 13 m, which was 2 m thicker than prognosed. Oil shows continued down to 1914 m in the underlying Skagerrak Formation. Below 1914 m, no shows were observed. There were no hydrocarbon indications in the well above top Intra-Draupne Formation sandstones. One core was cut in the sidetrack well bore from 1895.3 to 1922.5 m (lower Åsgard Formation, Intra-Draupne Formation Sandstone an

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/7123, documented in the API reference.