NORWAY · WELLBORES · NPDID 7141
6406/9-3
Exploration · Wildcat · P&A · Gas · A/S Norske Shell · PL 255
6406/9-3 is a wildcat exploration wellbore in the Norwegian Sea, drilled by A/S Norske Shell, entered Apr 18, 2013, to 5,138 m in the Tilje Fm.
Discovery 6406/9-3 (Onyx Sør) · On the map →
- 5,138
- m total depth · 5,135 m vertical
- 298
- m water depth
- Apr 18, 2013
- entered · completed Sep 29, 2013
- Tilje Fm
- at total depth · Early Jurassic
- 27
- m of core in 1 core
- 186
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED SEP 29, 2015
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- TRANSOCEAN BARENTS · Semisub steel
- Drilling days
- 165
- Kelly bushing elevation
- 40 m
- Maximum inclination
- 6.5999999°
- Drilling permit
- 1439-L
- Licensing round
- 16
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 64.42111° N, 6.97855° E
- Hydrocarbons in
- Ile Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6406/9-3 was drilled on the Onyx prospect between the Linnorm, Mjøsa and Noatun discoveries in the southern part of the Halten Terrace in the Norwegian Sea. The primary objective was to prove petroleum in the Middle to Early Jurassic sequence (Ile, Tofte, and Tilje formations. The secondary objective was to evaluate potential Åre Formation reservoirs.
Operations and results
Wildcat well 6406/9-3 was spudded with the semi-submersible installation Transocean Barents on 18 April 2013 and drilled to TD at 5138 m in the Early Jurassic Tilje Formation. No shallow gas was observed by the ROV at the wellhead or the MWD while drilling the 9-7/8'' pilot hole to a planned depth of 637 m. During drilling of the 26'' section at 1288 m a minor shallow water flow with some gas bubbles was observed at the wellhead and it was recognised that the Kai Formation was penetrated underbalanced. It was decided to set the 20'' casing shallow. Low leak-off at the 20'' shoe required running a 16'' contingency liner. The 14 3/4" x 17 1/2" section was drilled to section TD at 2270 m. A bad cement job around the 13 5/8" casing caused a technical sidetrack from 1645 m. The sidetrack is named 6406/9-3 T2. While drilling the basal part of the lower Cretaceous Lange Formation the interpreted real-time pore pressure exceeded the pre-drill high-case prediction and consequently the 10'' casing was set shallower than planned. The well was drilled with seawater and hi-vis sweeps down to 1288 m, with Glydril mud from 1288 m to 2294 m in both well tracks, and with EMS-400 oil based mud from 2294 m to TD.
The well penetrated the two primary reservoir targets of Jurassic age: the Ile Formation at 4635 m and the Tilje Formation at 4954 m. A non-c
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.