NORWAY · WELLBORES · NPDID 7175
16/2-17 B
Exploration · Appraisal · P&A · Shows · Statoil Petroleum AS · Johan Sverdrup · PL 265
16/2-17 B is an appraisal exploration wellbore in the North Sea, drilled by Statoil Petroleum AS, entered May 20, 2013, to 2,200 m in the Basement.
Discovery 16/2-6 Johan Sverdrup · On the map →
- 2,200
- m total depth · 1,937 m vertical
- 111
- m water depth
- May 20, 2013
- entered · completed Jun 16, 2013
- Basement
- at total depth
- 53.5
- m of core in 3 cores
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUN 16, 2015
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- OCEAN VANGUARD · Semisub steel
- Drilling days
- 28
- Kelly bushing elevation
- 22 m
- Maximum inclination
- 36°
- Drilling permit
- 1448-L
- Licensing round
- NST2000
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.80442° N, 2.52945° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 16/2-17 B is a geological sidetrack to well 16/2-17 S. The sidetrack targeted the Cliffhanger South prospect on the western side of the main western bounding fault on the Johan Sverdrup Discovery. The primary objective of 16/2-17 B was to investigate whether the Intra-Draupne Formation sandstone is present west of the main bounding fault. A secondary objective was to investigate the hydrocarbon potential of the Basement, which is expected to be directly beneath the Jurassic reservoir.
Operations and results
Appraisal sidetrack well 16/2-17 B was drilled with the semi-submersible installation Ocean Vanguard. It was kicked off from 600 m in the primary well bore on 20 May 2013 and drilled to TD at 2200 m (1937 m TVD) in pre-Devonian granitic basement. No significant problem was encountered in the operations. The well was drilled with XP-07 oil based mud.
This well did not encounter any Jurassic strata, nor any sands with potential reservoir properties. The top of the Basement was encountered at 2133 m, which was 23 m TVD deeper than prognosed. The granitic Basement contained hydrocabons; however, the fractured top was disappointing concerning reservoir properties. Apart from the shows in top of the granitic basement, no oil shows above the oil-based mud were recorded in the well.
Three cores were cut through the target prospect, from 2087 in the Rødby Formation to 2144.5 m in the Basement. The basement core recovered 70.5% (including ca 7.6 m of the basement); the two others had 100% recovery. MDT pressure evaluation was attempted at four depths in the top of the basement without success due to tight rock. No fluid samples were taken.
<p class=MsoBodyT
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/7175, documented in the API reference.