NORWAY · WELLBORES · NPDID 7220

16/2-18 S

Exploration · Appraisal · P&A · Oil · Statoil Petroleum AS · PL 265

1 document: reports, logs, and plots →

16/2-18 S is an appraisal exploration wellbore in the North Sea, drilled by Statoil Petroleum AS, entered Jul 5, 2013, to 1,970 m in the Basement.

Discovery 16/2-4 · On the map →

1,970
m total depth · 1,969 m vertical
112
m water depth
Jul 5, 2013
entered · completed Aug 8, 2013
Basement
at total depth · Pre-Devonian
20
m of core in 3 cores
83
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED AUG 8, 2015

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
OCEAN VANGUARD · Semisub steel
Drilling days
35
Kelly bushing elevation
22 m
Maximum inclination
6.5999999°
Drilling permit
1438-L
Licensing round
NST2000
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.83239° N, 2.46422° E
Hydrocarbons in
Basement · Pre-Devonian

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 16/2-18 S was drilled on the Cliffhanger North prospect west of the Johan Sverdrup Field on the Utsira High in the North Sea. The main objective was to prove hydrocarbons in the Late Jurassic intra-Draupne Formation sandstones and to verify the reservoir quality, fluid property, lateral extension and possible communication with the Johan Sverdrup discovery. The secondary objective of the well was to explore the hydrocarbon potential and reservoir properties in fractured and weathered granitic Basement.

Operations and results

Wildcat well 16/2-18 S was spudded with the semi-submersible installation Ocean Vanguard on 5 July 2013 and drilled to TD at 1970 m in fractured granitic basement rock. The well was drilled with a slightly deviated well path with the purpose of avoiding a prognosed shallow gas anomaly. A 9 7/8" pilot hole was drilled from 201 m to 455 m to check for shallow gas. No shallow gas was seen. No significant problem was encountered in the operations. The well was drilled with seawater and hi-vis sweeps down to 855 m and with KCl/Polymer/Glycol mud from 855 m to TD.

The Intra-Draupne Formation sandstone reservoir was not present at the well location; hence the primary objective of the well was not met. The secondary objective, however, was met by proving oil in weathered and fractured granitic Basement, which was encountered at 1864 m. An oil column of ca 15 m was estimated but no oil/water contact was established. Pressure data showed the discovery to be 2.6 bar higher and with a different oil gradient than in the Johan Sverdrup Field, and thus not in communication. However pressure and sampling data from the 16/2-4 Ragnarrok basement discovery has shown that the 16/2-18 S basement discovery is in co

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/7220, documented in the API reference.