NORWAY · WELLBORES · NPDID 7332

25/11-H-3 H

Development · Observation · Plugged · Oil · Statoil Petroleum AS · Svalin · PL 169

25/11-H-3 H is an observation development wellbore in the North Sea, drilled by Statoil Petroleum AS, entered Feb 19, 2014, to 1,189 m.

Discovery 25/11-16 Svalin · On the map →

1,189
m total depth · 1,189 m vertical
125
m water depth
Feb 19, 2014
entered · completed Mar 3, 2014
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED MAR 3, 2016

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
SONGA DELTA · Semisub steel
Drilling days
13
Kelly bushing elevation
29 m
Maximum inclination
—°
Drilling permit
3689-P
Licensing round
13
Plugged and abandoned
Mar 3, 2014
Core samples available
No
Cuttings samples available
No
Position · ED50
59.14316° N, 2.40849° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/7332, documented in the API reference.