NORWAY · WELLBORES · NPDID 7468
34/6-3 S
Exploration · Appraisal · P&A · Oil · Total E&P Norge AS · PL 554
34/6-3 S is an appraisal exploration wellbore in the North Sea, drilled by Total E&P Norge AS, entered May 30, 2014, to 4,462 m in the Statfjord Gp.
Discovery 34/6-2 S (Garantiana) · On the map →
- 4,462
- m total depth · 3,816 m vertical
- 380.5
- m water depth
- May 30, 2014
- entered · completed Sep 24, 2014
- Statfjord Gp
- at total depth · Early Jurassic
- 75.5
- m of core in 2 cores
- 142
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED SEP 24, 2016
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- LEIV EIRIKSSON · Semisub steel
- Drilling days
- 118
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 66.59999847°
- Drilling permit
- 1521-L
- Licensing round
- TFO2009
- Plugged and abandoned
- Sep 24, 2014
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 61.57487° N, 2.73019° E
- Hydrocarbons in
- Cook Fm · Early Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Wellbore 34/6-3 S was drilled to appraise the 34/6-2 S Garantiana discovery in the Visund area in the North Sea. The Primary objective was to prove hydrocarbon presence, determine fluid nature and evaluate reservoir characteristics in the Early Jurassic Cook Formation. The secondary objective was to prove petroleum in the Statfjord Group higher up on the structure than the 34/6-2 S well.
Operations and results
Garantiana appraisal well34/6-3 S was spudded with the semi-submersible installation Leiv Eiriksson on 30 May 2014 and drilled to 4462 m (3816 m TVD) in the Early Jurassic Statfjord Group. The well was drilled vertical down to ca 2500 m and deviated with a sail angle of ca 48 ° from there to TD. While RIH with cement stinger for plugging back the Statfjord reservoir prior to testing the Cook reservoir, severe losses leading to formation supercharging was observed. It resulted in ballooning effect. Several bleed off sequences was required to assess and regain normal situation. The well was drilled with seawater and hi-vis sweeps down to 1500 m, with Sildril Sodium Silicate WBM from 1500 m to 2058 m, with EMS-4600 NABM OBM from 2058 m to 3704 m, and with WARP-NABM mud from 3704 m to TD.
Top Cook Formation was penetrated at 3850 m (3493 m TVD) and was oil filled all through (oil-down-to) to top Burton Formation at 4000 m (3593 m TVD). The NTG of the Cook formation was proven to be 86 %, with average effective porosity of 22 % and water saturation of 17.5 %. Formation pressure data and the PVT analysis of the acquired DST samples indicate that the formation fluid in the Cook reservoir of 34/6-3S is the same as the fluid encountered in the 34/6-2S exploration well. The Statfjord Group proved to be wa
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/7468, documented in the API reference.