NORWAY · WELLBORES · NPDID 7640

7122/7-B-2 H

Development · Production · Producing · Oil · Eni Norge AS · Goliat · PL 229

7122/7-B-2 H is a production development wellbore in the Barents Sea, drilled by Eni Norge AS, entered Jun 13, 2015, to 3,280 m.

Discovery 7122/7-3 · On the map →

3,280
m total depth · 1,816 m vertical
387
m water depth
Jun 13, 2015
entered · completed Jul 20, 2015
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 18, 2026 · RELEASED JUL 20, 2017

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
SCARABEO 8 · Semisub steel
Drilling days
16
Kelly bushing elevation
34 m
Maximum inclination
—°
Drilling permit
3837-P
Licensing round
BARENTSHAVPROSJEKTET-97
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
71.28644° N, 22.28495° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/7640, documented in the API reference.