NORWAY · WELLBORES · NPDID 7658
6406/6-4 S
Exploration · Wildcat · P&A · Gas/condensate · Maersk Oil Norway AS · PL 510
6406/6-4 S is a wildcat exploration wellbore in the Norwegian Sea, drilled by Maersk Oil Norway AS, entered Aug 11, 2015, to 4,484 m in the Tilje Fm.
Discovery 6406/6-4 S (Tvillingen Sør) · On the map →
- 4,484
- m total depth · 4,468 m vertical
- 261
- m water depth
- Aug 11, 2015
- entered · completed Oct 30, 2015
- Tilje Fm
- at total depth · Early Jurassic
- —
- m of core
- 165
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JUL 5, 2016
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- LEIV EIRIKSSON · Semisub steel
- Drilling days
- 81
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 10.5°
- Drilling permit
- 1563-L
- Licensing round
- TFO2008
- Plugged and abandoned
- Oct 30, 2015
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 64.64186° N, 6.76721° E
- Hydrocarbons in
- Garn Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6406/6-4 S is a replacement well for 6406/6-4, which was junked due to technical problems. The well was drilled to test the Tvillingen Sør prospect on the Halten Terrace in the Norwegian Sea. The primary objective was to test the hydrocarbon potential in the Middle Jurassic Garn and Ile formations. The Tofte and Tilje formations were secondary objectives, while the Åre Formation was a tertiary objective.
Operations and results
Wildcat well 6406/6-4 S was spudded with the semi-submersible installation Leiv Eiriksson on 11 August 2015 and drilled to TD at 4484 m (4468 m TVD) in the Early Jurassic Tilje Formation. The spud location was set 30 m away from the 6406/6-4 location. The well was drilled with an S-shaped trajectory. It was drilled vertical down to 1995 m, and then deviated with a sail angle of ca 9.5 ° from ca 2600 m to ca 3600 m, and then vertical again from 3700 m to TD. No significant problem was encountered in the operations. The well was drilled with Seawater down to 1364 m, with KCl/Glydril mud from 1364 m to 1995 m, and with EMS 4400 oil based mud from 1995 m to TD.
Top of the primary objective Garn Formation was encountered at 4006 m (3990 m TVD), 48 m TVD shallow to prognosis. The Garn sandstones held a 25 m gas/condensate column down to a hydrocarbon/water contact at 4031 m (4015 m TVD). The deeper Ile, Tofte and Tilje Formations also came in slightly shallow to prognosis but were all found to be water bearing. Shows were recorded all through the Garn and Ile formations. Due to water wet Tofte and Tilje formations, the Åre Formation was not drilled.
Coring was not performed due to the reservoir pressure being above the P50 predrill prediction. Gas/condensate
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/7658, documented in the API reference.