NORWAY · WELLBORES · NPDID 7707
6407/8-7 A
Exploration · Wildcat · P&A · Dry · Statoil Petroleum AS · PL 348 C
6407/8-7 A is a wildcat exploration wellbore in the Norwegian Sea, drilled by Statoil Petroleum AS, entered May 13, 2015, to 3,178 m in the Åre Fm.
- 3,178
- m total depth · 2,810 m vertical
- 259
- m water depth
- May 13, 2015
- entered · completed May 23, 2015
- Åre Fm
- at total depth · Late Triassic
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED MAY 23, 2017
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- TRANSOCEAN SPITSBERGEN · Semisub steel
- Drilling days
- 8
- Kelly bushing elevation
- 40 m
- Maximum inclination
- 38.20000076°
- Drilling permit
- 1581-L
- Licensing round
- TFO2004
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 64.38452° N, 7.56193° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6407/8-7 and its sidetrack 6407/8-7 A were drilled to test the Bister prospect about four kilometres north of the Hyme field in the southern part of the Norwegian Sea and 140 kilometres north of Kristiansund. The main objective for the sidetrack 6407/8-7 A was to test the presence of commercial accumulations in the Tilje Formation higher up on the structure.
Operations and results
Wildcat well 6407/8-7 A was kicked off from the main well at 1064 m on 13 May 2015. It was drilled with the semi-submersible installation Transocean Spitsbergen to TD at 3178 m (2810 m TVD) m in Triassic sediments belonging to the Åre Formation. No significant problem was encountered in the operations. The well was drilled with EMS-4400 oil based mud from kick-off to TD.
The well penetrated a ca 110 m thick Tilje formation, of which 80 m was sandstone of good reservoir quality. The well also penetrated 200 m of the Åre formation, of which 95 m was sandstone with good reservoir properties. The well is dry. Some shows were observed on cuttings in both the main well and the sidetrack. However, when using OBM most HC's will be washed out and/or masked by the oil base in the mud. Preliminary post well analysis confirms that the shows observed on cuttings were from the OBM and not formation.
No cores were cut. No fluid sample was taken.
The well was permanently abandoned on 23 May 2015 as a dry well.
Testing
No drill stem test was performed.
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.