NORWAY · WELLBORES · NPDID 7744

15/6-B-16

Development · Production · Closed · Oil · Statoil Petroleum AS · Gina Krog · PL 029 C

15/6-B-16 is a production development wellbore in the North Sea, drilled by Statoil Petroleum AS, entered Aug 23, 2015, to 6,745 m.

Discovery 15/5-1 Gina Krog · On the map →

6,745
m total depth · 3,877 m vertical
116.3
m water depth
Aug 23, 2015
entered · completed Apr 27, 2016
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 20, 2026 · RELEASED APR 27, 2018

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
MAERSK INTEGRATOR · Jack-up 3 legs
Drilling days
38
Kelly bushing elevation
65.5 m
Maximum inclination
—°
Drilling permit
3902-P
Licensing round
3
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
58.57198° N, 1.69692° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/7744, documented in the API reference.