NORWAY · WELLBORES · NPDID 7773

30/4-A-3 B

Development · Production · Producing · Oil · Total E&P Norge AS · Martin Linge · PL 043

30/4-A-3 B is a production development wellbore in the North Sea, drilled by Total E&P Norge AS, entered Aug 5, 2015, to 3,470 m.

Discovery 30/7-2 · On the map →

3,470
m total depth · 1,799 m vertical
115
m water depth
Aug 5, 2015
entered · completed Aug 13, 2015
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 8, 2026 · RELEASED AUG 13, 2017

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
MAERSK INTREPID · Jack-up 3 legs
Drilling days
9
Kelly bushing elevation
57.7 m
Maximum inclination
—°
Drilling permit
3778-P1
Licensing round
3
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
60.50621° N, 2.01488° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/7773, documented in the API reference.