1/5-5 is a wildcat exploration wellbore in the North Sea, drilled by Total E&P Norge AS, entered Feb 24, 2016, to 5,942 m in the Bryne Fm.
- 5,942
- m total depth · 5,940 m vertical
- 70
- m water depth
- Feb 24, 2016
- entered · completed Sep 16, 2016
- Bryne Fm
- at total depth
- —
- m of core
- 197
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED SEP 16, 2018
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- MÆRSK GALLANT · Jack-up 3 legs
- Drilling days
- 206
- Kelly bushing elevation
- 48 m
- Maximum inclination
- 4°
- Drilling permit
- 1608-L
- Licensing round
- TFO2011
- Plugged and abandoned
- Sep 16, 2016
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 56.73001° N, 2.64581° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 1/5-5 was drilled to test the Solaris prospect in the Central Graben, about 40 km North-West of the Ekofisk field, close to the border between UK and Norway. The primary target was to prove reservoir and hydrocarbon presence in Late Jurassic reservoir sands of the Ula Formation. Secondary target was the Triassic Skagerrak Formation.
Operations and results
Wildcat well 1/5-5 was spudded with the jack-up installation Mærsk Gallant on 24 February 2016 and drilled to TD at 5942 m in the Middle - Late Vestland Group. A pilot hole was drilled from 210 to 1140 m to check for shallow gas, but no gas was seen and the opening up and continuation of the well could be carried out. The well is a deep high temperature-high pressure well. Thirty-nine days were counted as NPT. The single main cause of NPT (11 days) was main rig maintenance and changing the drilling line after installing BOP at 1140 m. Otherwise operations proceeded without significant problems. The well was drilled with seawater and hi-vis pills down to 1140 m, with NABM oil based mud from 1140 m to TD.
The primary target Ula Formation sandstone was encountered at 5831 m. The Ula Formation was 80 m thick and consisted mainly of sandstones and a few siltstones. The reservoir showed traces of gas and wireline logging was carried out for further classification. The logging proved the reservoir tight, of moderate to poor quality, and dry. There were no shows above the oil-based mud. As the primary reservoir was found dry, it was decided not to continue to the secondary, Triassic target.
No cores were cut. No fluid sample was taken.
The well was permanently abandoned on 16 S
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.