NORWAY · WELLBORES · NPDID 801

2/7-A-25

Development · Production · Plugged · Oil · Phillips Petroleum Company Norway · Eldfisk · PL 018

2/7-A-25 is a production development wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Jun 5, 1978, to 3,246.4 m.

Discovery 2/7-1 Eldfisk · On the map →

3,246.4
m total depth · 3,096.5 m vertical
71
m water depth
Jun 5, 1978
entered · completed Jan 8, 1979
—
at total depth
38
ft of core in 10 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JAN 8, 1981

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
ELDFISK A · Jacket 12 legs
Drilling days
218
Kelly bushing elevation
41 m
Maximum inclination
—°
Drilling permit
110-P
Licensing round
1-A
Plugged and abandoned
Apr 13, 2012
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.37674° N, 3.26578° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/801, documented in the API reference.