NORWAY · WELLBORES · NPDID 8056
25/2-18 B
Exploration · Appraisal · P&A · Dry · Aker BP ASA · Hugin Satellitter · PL 442
25/2-18 B is an appraisal exploration wellbore in the North Sea, drilled by Aker BP ASA, entered Oct 19, 2016, to 4,335 m in the Sleipner Fm.
Discovery 25/2-18 S (Langfjellet) · On the map →
- 4,335
- m total depth · 3,803 m vertical
- 121
- m water depth
- Oct 19, 2016
- entered · completed Oct 30, 2016
- Sleipner Fm
- at total depth · Middle Jurassic
- —
- m of core
- 127
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED OCT 30, 2018
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- MAERSK INTERCEPTOR · Jack-up 3 legs
- Drilling days
- 12
- Kelly bushing elevation
- 55 m
- Maximum inclination
- 47.59999847°
- Drilling permit
- 1640-L
- Licensing round
- TFO2006
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 59.82503° N, 2.63169° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
Wellbore history
General
Well 25/2-18 B is the second geological sidetrack to well 25/2-10 S, located on the Bjørgvin Arch, four kilometers south of the 25/2-10 S (Frigg Gamma Delta) oil/gas discovery and eight kilometers north of the Frøy field in the North Sea. The 25/2-18 S well and the first sidetrack proved oil in the Middle Jurassic Hugin Formation, the Langfjellet prospect. The sidetrack 25/2-18 B was drilled to the north of the main wellbore located in a separate segment of the Langfjellet structure. The objective for 25/2-18 B was to test the hydrocarbon potential in Hugin and Sleipner Formations.
Operations and results
Appraisal well 25/2-18 B was kicked off at 1570 m in the main well bore on 19 October 2016. It was drilled with the jack-up installation Mærsk Interceptor to TD at 4335 m (3803 m TVD) m in the Middle Jurassic Sleipner Formation. No significant problem was encountered in the operations. The well was drilled with Versatec oil based mud from kick-off to TD.
The Hugin Formation came in at 3977 m (3457 m TVD), and the Sleipner Formation came in at 4100 m (3576 m TVD) In general, reservoir distribution and properties were in accordance with the previous sidetrack, but entirely water bearing in this location. There were no shows above the OBM in the well.
No conventional cores were cut. MDT fluid samples were taken at 4017.69 m.
The well was permanently abandoned on 30 October as a dry well.
Testing<span lang=EN
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/8056, documented in the API reference.