35/9-13 is a wildcat exploration wellbore in the North Sea, drilled by Spirit Energy Norge AS, entered Dec 25, 2017, to 3,223 m in the Rødby Fm.

On the map →

3,223
m total depth · 3,223 m vertical
365
m water depth
Dec 25, 2017
entered · completed Jan 20, 2018
Rødby Fm
at total depth · Early Cretaceous
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED SEP 3, 2019

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
SONGA ENABLER · Semisub steel
Drilling days
27
Kelly bushing elevation
32 m
Maximum inclination
1°
Drilling permit
1674-L
Licensing round
TFO2012
Plugged and abandoned
Mar 29, 2018
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.42232° N, 3.82771° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 35/9-13 was drilled to test the Tethys prospect on the Måløy slope in the northern North Sea. The primary objective was to test the hydrocarbon potential in Intra-Heather sandstone of Oxfordian age. Dependent on the results of the well, optional production testing was planned to test reservoir productivity, in addition to an optional side-track to further evaluate the prospect.

Operations and results

A 9 7/8" pilot hole was drilled 30 m off location from the 35/9-13 well. No shallow gas or water flow was observed.

Wildcat well 35/9-13 was spudded with the semi-submersible installation Songa Enabler on 25 December. At 2555 m in the Tryggvason Formation the bit drilled into a fault zone and total losses occurred. Losses were cured with fibrous materials and reduction of mud weight. Drilling of the 12 ¼ hole commenced to 3223 m in the Early Jurassic Rødby Formation. While running in hole with the 8 1/2" BHA the operation was stopped at 1770 m due to observation of a

water flow around the well head. The water flow was identified flowing outside the 20” casing because of bad cement bond. The water most likely came from ca 661 m in the top of a Paleogene sand. It was decided to P&A the well for safety reasons. The well was drilled with seawater and hi-vis pills down to 948 m, with KCl/GEM/polymer mud from 948 m to 1822 m, and with Innovert oil-based mud from 1822 m to TD.

The well did not fulfil its objectives.

The only log on wire line was a CBL log to evaluate the cement behind the casing and source of the shallow water flow. No reliable formation temperature co

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/8288, documented in the API reference.