NORWAY · WELLBORES · NPDID 8293

15/6-14 S

Exploration · Wildcat · Plugged · Dry · Statoil Petroleum AS · PL 029 C

1 document: reports, logs, and plots →

15/6-14 S is a wildcat exploration wellbore in the North Sea, drilled by Statoil Petroleum AS, entered Dec 20, 2017, to 4,684 m in the Sleipner Fm.

On the map →

4,684
m total depth · 3,916 m vertical
116
m water depth
Dec 20, 2017
entered · completed Dec 26, 2017
Sleipner Fm
at total depth · Middle Jurassic
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED DEC 26, 2019

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MAERSK INTEGRATOR · Jack-up 3 legs
Drilling days
7
Kelly bushing elevation
65.5 m
Maximum inclination
50.90000153°
Drilling permit
1675-L
Licensing round
2-A
Plugged and abandoned
Dec 26, 2017
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.57218° N, 1.69679° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 15/6-14 S was drilled on the Gina Krog in the Ve Sub-basin in the North Sea. The objective was to prove commercial hydrocarbon volumes in the Hugin Formation in the unproven Gina Krog Central 3 Segment, contributing to the Gina Krog Field production.

Operations and results

Wildcat well 15/6-14 S was kicked off from main bore 15/6-B-2 below the 13 5/8" casing shoe at 3334 m on 20 December 2017. It was drilled with the jack-up installation Maersk Integrator. It was drilled to TD at 4684 m (3916.3 m TVD) in the Middle Jurassic Sleipner Formation. Operations proceeded without significant problems. The well was drilled with Innovert oil-based mud from kick-off to TD.

Twenty-nine meters of Hugin Formation sandstone was penetrated from 4628 m (3861 m TVD) to 4657 m (3890 m TVD). The formation did not contain mobile hydrocarbons based on log interpretation. There were no oil shows above the OBM in the well, and gas levels in the Hugin Formation were low.

No cores were cut. No logs were run on wire line and no fluid sample was taken.

The well was permanently abandoned on 26 December 2017 as a dry well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/8293, documented in the API reference.