NORWAY · WELLBORES · NPDID 8293
15/6-14 S
Exploration · Wildcat · Plugged · Dry · Statoil Petroleum AS · PL 029 C
15/6-14 S is a wildcat exploration wellbore in the North Sea, drilled by Statoil Petroleum AS, entered Dec 20, 2017, to 4,684 m in the Sleipner Fm.
- 4,684
- m total depth · 3,916 m vertical
- 116
- m water depth
- Dec 20, 2017
- entered · completed Dec 26, 2017
- Sleipner Fm
- at total depth · Middle Jurassic
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED DEC 26, 2019
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- MAERSK INTEGRATOR · Jack-up 3 legs
- Drilling days
- 7
- Kelly bushing elevation
- 65.5 m
- Maximum inclination
- 50.90000153°
- Drilling permit
- 1675-L
- Licensing round
- 2-A
- Plugged and abandoned
- Dec 26, 2017
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.57218° N, 1.69679° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 15/6-14 S was drilled on the Gina Krog in the Ve Sub-basin in the North Sea. The objective was to prove commercial hydrocarbon volumes in the Hugin Formation in the unproven Gina Krog Central 3 Segment, contributing to the Gina Krog Field production.
Operations and results
Wildcat well 15/6-14 S was kicked off from main bore 15/6-B-2 below the 13 5/8" casing shoe at 3334 m on 20 December 2017. It was drilled with the jack-up installation Maersk Integrator. It was drilled to TD at 4684 m (3916.3 m TVD) in the Middle Jurassic Sleipner Formation. Operations proceeded without significant problems. The well was drilled with Innovert oil-based mud from kick-off to TD.
Twenty-nine meters of Hugin Formation sandstone was penetrated from 4628 m (3861 m TVD) to 4657 m (3890 m TVD). The formation did not contain mobile hydrocarbons based on log interpretation. There were no oil shows above the OBM in the well, and gas levels in the Hugin Formation were low.
No cores were cut. No logs were run on wire line and no fluid sample was taken.
The well was permanently abandoned on 26 December 2017 as a dry well.
Testing
No drill stem test was performed.
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/8293, documented in the API reference.