NORWAY · WELLBORES · NPDID 8318
6604/5-1
Exploration · Wildcat · P&A · Gas · Wintershall Norge AS · PL 894
6604/5-1 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Wintershall Norge AS, entered Jan 10, 2018, to 3,858 m in the Springar Fm.
Discovery 6604/5-1 (Balderbrå) · On the map →
- 3,858
- m total depth · 3,858 m vertical
- 1,219
- m water depth
- Jan 10, 2018
- entered · completed Mar 22, 2018
- Springar Fm
- at total depth · Late Cretaceous
- 109.8
- m of core in 2 cores
- 132
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED MAR 22, 2020
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- WEST PHOENIX · Semisub steel
- Drilling days
- 65
- Kelly bushing elevation
- 39 m
- Maximum inclination
- 2°
- Drilling permit
- 1680-L
- Licensing round
- TFO2016
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 66.59373° N, 4.54904° E
- Hydrocarbons in
- Springar Fm · Late Cretaceous
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6604/5-1 was drilled to test the Balderbrå prospect in the Vøring Basin of the Norwegian Sea. The primary objective was to prove reservoir presence and hydrocarbon accumulations in Springar Sandstone intervals. TD was planned to be 150 m below the base of the deepest Springar Sandstone. In case of a discovery a technical side-track was planned to obtain cores from the reservoir.
Operations and results
A pilot hole 6604/5-U-1 was drilled 50 m away from the mainbore location in a 12 1/4" hole in order to identify the correct setting depth for the 20" x 13-3/8" casing below the ooze.
Wildcat well 6604/5-1 was spudded with the semi-submersible installation West Phoenix on 10 January 2018 and drilled to TD at 3858 m in the Late Cretaceous Springar Formation. Gas was discovered, and the well was side-tracked at 3308 m to obtain cores from the hydrocarbn-bearing sandstones. The side-track reached TD at 3760 m in the Late Cretaceous Springar Formation. During P&A in the mainbore a leak in the slip joint between the gator lock and inner barrel was discovered. This led to a 10 days repair period before normal operations were resumed. The well was drilled with seawater and hi-vis pills down to 2375 m and with Innovert oil-based mud from 2382 m to TD. Innovert OBM was used also in the side-track.
Three Springar was encountered at 3259 m. Intra-Springar sands were penetrated with tops in the mainbore at 3336 m, 3453 m, and 3582.5 m. In the side-track the sands were penetrated 1 – 2 m MD deeper. All three sands were gas filled with gas-down to contacts. Pressure measurements showed that the three sandstones have different pressure regimes. Weak, light-coloured shows w
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/8318, documented in the API reference.