NORWAY · WELLBORES · NPDID 8318

6604/5-1

Exploration · Wildcat · P&A · Gas · Wintershall Norge AS · PL 894

1 document: reports, logs, and plots →

6604/5-1 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Wintershall Norge AS, entered Jan 10, 2018, to 3,858 m in the Springar Fm.

Discovery 6604/5-1 (Balderbrå) · On the map →

3,858
m total depth · 3,858 m vertical
1,219
m water depth
Jan 10, 2018
entered · completed Mar 22, 2018
Springar Fm
at total depth · Late Cretaceous
109.8
m of core in 2 cores
132
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED MAR 22, 2020

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST PHOENIX · Semisub steel
Drilling days
65
Kelly bushing elevation
39 m
Maximum inclination
2°
Drilling permit
1680-L
Licensing round
TFO2016
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
66.59373° N, 4.54904° E
Hydrocarbons in
Springar Fm · Late Cretaceous

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6604/5-1 was drilled to test the Balderbrå prospect in the Vøring Basin of the Norwegian Sea. The primary objective was to prove reservoir presence and hydrocarbon accumulations in Springar Sandstone intervals. TD was planned to be 150 m below the base of the deepest Springar Sandstone. In case of a discovery a technical side-track was planned to obtain cores from the reservoir.

Operations and results

A pilot hole 6604/5-U-1 was drilled 50 m away from the mainbore location in a 12 1/4" hole in order to identify the correct setting depth for the 20" x 13-3/8" casing below the ooze.

Wildcat well 6604/5-1 was spudded with the semi-submersible installation West Phoenix on 10 January 2018 and drilled to TD at 3858 m in the Late Cretaceous Springar Formation. Gas was discovered, and the well was side-tracked at 3308 m to obtain cores from the hydrocarbn-bearing sandstones. The side-track reached TD at 3760 m in the Late Cretaceous Springar Formation. During P&A in the mainbore a leak in the slip joint between the gator lock and inner barrel was discovered. This led to a 10 days repair period before normal operations were resumed. The well was drilled with seawater and hi-vis pills down to 2375 m and with Innovert oil-based mud from 2382 m to TD. Innovert OBM was used also in the side-track.

Three Springar was encountered at 3259 m. Intra-Springar sands were penetrated with tops in the mainbore at 3336 m, 3453 m, and 3582.5 m. In the side-track the sands were penetrated 1 – 2 m MD deeper. All three sands were gas filled with gas-down to contacts. Pressure measurements showed that the three sandstones have different pressure regimes. Weak, light-coloured shows w

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.