16/1-28 S is an appraisal exploration wellbore in the North Sea, drilled by Lundin Norway AS, entered Apr 3, 2018, to 4,880 m in the Basement.
Discovery 16/1-12 Troldhaugen · On the map →
- 4,880
- m total depth · 1,918 m vertical
- 108
- m water depth
- Apr 3, 2018
- entered · completed Aug 23, 2018
- Basement
- at total depth · Pre-Devonian
- —
- m of core
- 80
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED AUG 23, 2020
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- COSLInnovator · Semisub steel
- Drilling days
- 134
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 91.19999695°
- Drilling permit
- 1687-L
- Licensing round
- TFO2004
- Plugged and abandoned
- Aug 23, 2018
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.81430° N, 2.27063° E
- Hydrocarbons in
- Basement · Pre-Devonian
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 16/1-28 S was drilled to appraise the 16/1-12 Rolvsnes Discovery on the Utsira High in the North Sea. The objective was to verify pressure communication within the reservoir and determine possible depletion resulting from production from the Edvard Grieg Field. Further objectives were to prove the drillability of a 2.5 km long horizontal well within granitic basement, and to perform a production test to better understand the reservoir performance.
Operations and results
Appraisal well 16/1-28 S was spudded with the semi-submersible installation COSL Innovator on 3 April and a 36 “x 42” was drilled to 200 m. A 9 7/8” pilot was drilled from 200 to 780 m due to shallow gas warnings. No shallow gas was observed. Hole instability problems were encountered in the 12 ¼” section, from 1742 to 2186 m, and this section was unintentionally side-tracked at 1978 m while reaming. The side-track, 16/1-28 ST2, was drilled to final TD at 4880 m (1919 m TVD) in granite basement rock. The well was drilled vertical down to 957 m, building angle from there to ca 2410 m, from where the well was drilled horizontally. A union strike delayed the DST operations with approximately 11 days. The well was drilled with seawater and hi-vis pills down to 957 m, with Aquadril mud from 957 m to 1734 m, with Delta TEQ oil-based mud from 1734 m to 2180 m, and with Performadril mud from 2180 m to TD.
Basement was encountered at 2335.5 m (1908.8 m TVD) and well TD was reached at 4880 m (1919.0 m TVD). A total horizontal section of 2500 m in basement was drilled with an average penetration rate of 9.9 m/h. 65 pressure measurements were attempted, the successful tests showed a depletion of about 10 bars, which can be the result of production from the Edvard G
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/8357, documented in the API reference.