NORWAY · WELLBORES · NPDID 8383

16/1-29 S

Exploration · Wildcat · P&A · Oil/gas · Statoil Petroleum AS · Symra · PL 167

1 document: reports, logs, and plots →

16/1-29 S is a wildcat exploration wellbore in the North Sea, drilled by Statoil Petroleum AS, entered Apr 22, 2018, to 2,024 m in the Basement.

Discovery 16/1-29 S Symra · On the map →

2,024
m total depth · 2,010 m vertical
114
m water depth
Apr 22, 2018
entered · completed Jun 3, 2018
Basement
at total depth
15.5
m of core in 2 cores
100
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUN 3, 2020

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DEEPSEA BERGEN decom · Semisub steel
Drilling days
43
Kelly bushing elevation
23 m
Maximum inclination
12°
Drilling permit
1691-L
Licensing round
13
Plugged and abandoned
Jun 3, 2018
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.97284° N, 2.29561° E
Hydrocarbons in
Grid Fm · Eocene
Hydrocarbons in
Heimdal Fm · Paleocene
Hydrocarbons in
Zechstein Gp · Permian

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 16/1-29 S was drilled to test the Lille Prinsen prospect on the north-western part of the Utsira High in the North Sea. The exploration objective was to test the Lille Prinsen prospect, believed to mainly consist of Triassic sediments, with the possibility of (thin) transgressive Jurassic sands similar to Johan Sverdrup on top. In addition, the well was expected to penetrate Grid and Heimdal sands, which were found to contain oil and gas in the 16/1-6 S Verdandi well.

Operations and results

Wildcat well 16/1-29 S was spudded with the semi-submersible installation Deepsea Bergen on 22 April 2018. During the operation, the well (16/1-29 S) experienced unexpected heavy mud losses when drilling into the reservoir section, eventually leading to well collapse and stuck drill string. Consequently, a technical side-track (16/1-29 ST2) was kicked off at 1225 m and this was successfully drilled through the reservoir section. Continuous mud losses were also experienced in the reservoir section of the technical side-track, but these were controlled by lowering the mud weight. The well was finally drilled to planned TD at 2024 m (2010 m TVD) in Basement rock. The well was drilled with seawater and hi-vis pills down to 550 m, with KCl mud from 550 m to 1210 m, with Enviromul oil-based mud from 1210 m to 1863 m (mainwell and side-track) and with KCl/polymer/GEM mud from 1863 m to final TD.

The Eocene Grid Formation and the Paleocene Heimdal Formation were encountered at 1419 m (1416 m TVD), and 1794 m (1785 m TVD), respectively. They both contained gas over oil. In the Grid formation a gas-oil contact was found at 1462.6 m (1459.9 m TVD) with a free water level at 1498.9 m (1495.8 m TVD). In the Heimdal Formation a gas-oil contact was

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.