NORWAY · WELLBORES · NPDID 8400

8/10-B-2 H

Development · Injection · Injecting · Water · Spirit Energy Norge AS · Oda · PL 405

8/10-B-2 H is an injection development wellbore in the North Sea, drilled by Spirit Energy Norge AS, entered Jul 29, 2018, to 3,640 m.

Discovery 8/10-4 S Oda · On the map →

3,640
m total depth · 3,223 m vertical
66
m water depth
Jul 29, 2018
entered · completed Sep 25, 2018
—
at total depth
53.7
m of core in 1 core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 9, 2026 · RELEASED SEP 25, 2020

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MAERSK INTERCEPTOR · Jack-up 3 legs
Drilling days
25
Kelly bushing elevation
55.3 m
Maximum inclination
—°
Drilling permit
4651-P
Licensing round
TFO2006
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
57.07304° N, 3.06526° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/8400, documented in the API reference.