NORWAY · WELLBORES · NPDID 8498
7322/7-1
Exploration · Wildcat · P&A · Dry · Spirit Energy Norge AS · PL 852
7322/7-1 is a wildcat exploration wellbore in the Barents Sea, drilled by Spirit Energy Norge AS, entered Jul 21, 2018, to 797 m in the Kolje Fm.
- 797
- m total depth · 797 m vertical
- 454
- m water depth
- Jul 21, 2018
- entered · completed Aug 11, 2018
- Kolje Fm
- at total depth · Early Cretaceous
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED AUG 11, 2020
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- ISLAND INNOVATOR · Semisub steel
- Drilling days
- 21
- Kelly bushing elevation
- 30 m
- Maximum inclination
- 1.20000005°
- Drilling permit
- 1710-L
- Licensing round
- 23
- Plugged and abandoned
- Aug 11, 2018
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 73.41343° N, 22.03949° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 7322/7-1 was drilled to test the Scarecrow prospect on the eastern shoulder of the Fingerdjupet Sub-basin in the Barents Sea. The primary objective was to evaluate the hydrocarbon potential in shallow buried Early Cretaceous reservoirs. The Scarecrow play model had not previously been tested in the area and carried large uncertainties.
Operations and results
Wildcat well 7322/7-1 was spudded with the semi-submersible installation Island Innovator on 21 July 2018. An 8 1/2" pilot hole was drilled from the 30" conductor shoe (494.5 m) to 646 m to check for shallow gas and for data acquisition. A riserless mud return system was used (RMR) in the pilot, and this enabled sampling of cuttings and recording of drill gas. Also, a seismic while-drilling tool was used in the pilot hole, mainly to reduce the depth uncertainty to the Top Kolje Formation with potential reservoir. No shallow gas was detected. The pilot hole was logged and opened up to a 17 ½ section and drilling commenced to TD at 797 m in the Early Cretaceous Kolje Formation. Operations proceeded without significant problems. The well was drilled with seawater and hi-vis pills down to 495 m, while the pilot and main well was drilled with Glydril mud from 495 m to TD.
Top Kolje Formation was encountered at 661 m. The prognosed reservoir interval was encountered at 677 m and consists of claystone and siltstone with minor limestone interbeds. Based on biostratigraphy it is interpreted to be part of the Kolje Formation. An increase in drill gas was observed when drilling into this section, otherwise there were no oil shows (fluorescence) or other hydrocarbon indications in the well.
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/8498, documented in the API reference.