NORWAY · WELLBORES · NPDID 852

6506/12-5

Exploration · Appraisal · P&A · Oil · Den norske stats oljeselskap a.s · Åsgard · PL 094

10 documents: reports, logs, and plots →

6506/12-5 is an appraisal exploration wellbore in the Norwegian Sea, drilled by Den norske stats oljeselskap a.s, entered Oct 17, 1985, to 4,587 m in the Åre Fm.

Discovery 6506/12-3 Smørbukk Sør · On the map →

4,587
m total depth · 4,587 m vertical
301
m water depth
Oct 17, 1985
entered · completed Mar 27, 1986
Åre Fm
at total depth · Early Jurassic
428.2
m of core in 27 cores
149
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAR 27, 1988

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DYVI DELTA · Semisub steel
Drilling days
162
Kelly bushing elevation
29 m
Maximum inclination
0°
Drilling permit
485-L
Licensing round
8
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
65.04128° N, 6.97276° E
Hydrocarbons in
Lysing Fm · Late Cretaceous
Hydrocarbons in
Garn Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6506/12-5 was the third well drilled on the Smørbukk Sør Discovery (Beta-structure) in block 6506/12, Haltenbanken area. The well was designed to appraise the hydrocarbon potential and define the hydrocarbon-water contacts. Primary target was Middle and Early Jurassic sandstone. The Fangst Group siltstone member was expected to be sealing at this depth. The well would also test if intervals within the Ror and Tilje formations also could be sealing rocks. Secondary target was the Late Cretaceous Lysing Formation of the Cromer Knoll Group.

Prognosed TD was in the Åre formation at 4559 m RKB.

Operations and results

Appraisal well 6506/12-5 was spudded with the semi-submersible installation Dyvi Delta on 17 October 1985 and drilled to TD at 4587 m in the Early Jurassic Åre Formation. The well was drilled with less than 2.5 deg deviation down to 4235 m. There were minor incidents with a failed anchor and lost circulation in the top hole. A poorly cemented 9 5/8" casing required 116 hours amendment before normal drilling could commence. The well was drilled with spud mud down to 393 m. From here a pilot hole was drilled to 1080 m using gypsum/polymer mud, and then opened up using spud mud. Further drilling was with gypsum/polymer mud from 1080 m to 3519 m, and with gel/lignite/lignosulphonate from 3519 m to TD. Shallow gas was not encountered.

Secondary target Lysing Formation came in at 3157 m and primary target Garn Formation at 3948 m. Hydrocarbons were encountered in both. An OWC was found in the Lysing Formation at 3178.2 m, and another OWC in the Garn Formation at 4010.5 m. The Not Formation as well as top of the Garn Formation was found to be sealing in this well.

Cores were cut in the Upper Cromer Knoll Lysing Sands and throughout most of the interval from the lower part of the Viking Group at 3910 m down to 4362 m in the Tilje Formation. A total of 429.43 m was recovered in 27 cores. Core n

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/852, documented in the API reference.