NORWAY · WELLBORES · NPDID 853
6507/7-4
Exploration · Appraisal · P&A · Oil/gas · Conoco Norway Inc. · Heidrun · PL 095
6507/7-4 is an appraisal exploration wellbore in the Norwegian Sea, drilled by Conoco Norway Inc., entered Nov 6, 1985, to 2,850 m in the Tilje Fm.
Discovery 6507/7-2 Heidrun · On the map →
- 2,850
- m total depth · 2,850 m vertical
- 345
- m water depth
- Nov 6, 1985
- entered · completed Jan 13, 1986
- Tilje Fm
- at total depth · Early Jurassic
- 330.6
- m of core in 12 cores
- 98
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JAN 13, 1988
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- NORTRYM · Semisub steel
- Drilling days
- 69
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 2.79999995°
- Drilling permit
- 490-L
- Licensing round
- 8
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 65.31988° N, 7.26250° E
- Hydrocarbons in
- Ile Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
Wellbore history
General
Appraisal well 6507/7-4 was drilled in the northern part of the Haltenbanken area, some 190 km west of the Norwegian coast. It was drilled to evaluate the "B" prospect in the intensely faulted zone that lies at the intersection of the Nordland Ridge in the northeast and the Halten Terrace in the south. The prospect was in a southward plunging horst block formed by a Late Jurassic tensional fault system. Well 6507/7-4 was drilled in a down dip position relative to discovery well 6507/7-2 and the prime objective was to establish the oil/water contact in sandstones of the Middle Jurassic Tomma Formation.
Operations and results
Well 6507/7-4 was spudded with the semi-submersible installation Nortrym on 6 November 1985 and drilled to TD at 2850 m in the Early Jurassic Tilje Formation. Due to adverse weather conditions in the first week of operations spudding of the well was made difficult, and 4.5 days were lost as WOW in this phase. Swelling clays (gumbo) caused some problems in the 17 1/2" section. The upper part of the core barrel in core no 3 ruptured, unfortunately exactly in the section around OWC. Otherwise operations proceeded without significant problems. The well was drilled with sea water and gel sweeps down to 1021 m and with gypsum/polymer mud from 1021 m to TD.
The Tomma Formation sandstones (Garn Formation) was prognosed at 2455 m, and encountered at 2449 m. The Garn Formation was found oil bearing. Oil shows were observed on core no 1 from 2444.5 m (driller's depth) down to 2490.7 m. It was described as a uniform strong yellow show with even white cut down to 2463 m when the show became m
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.