NORWAY · WELLBORES · NPDID 863

6406/3-2

Exploration · Wildcat · P&A · Oil · Den norske stats oljeselskap a.s · Trestakk · PL 091

11 documents: reports, logs, and plots →

6406/3-2 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Den norske stats oljeselskap a.s, entered Jun 28, 1986, to 4,523 m in the Åre Fm.

Discovery 6406/3-2 Trestakk · On the map →

4,523
m total depth · 4,522 m vertical
300
m water depth
Jun 28, 1986
entered · completed Nov 22, 1986
Åre Fm
at total depth · Early Jurassic
284.6
m of core in 17 cores
160
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED NOV 22, 1988

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST VANGUARD · Semisub steel
Drilling days
148
Kelly bushing elevation
22 m
Maximum inclination
3.4000001°
Drilling permit
519-L
Licensing round
8
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
64.86299° N, 6.83108° E
Hydrocarbons in
Garn Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6406/3-2 is located in the middle of the block, west of the Tyrihans North field off shore Mid Norway. The primary objective of the well was to find hydrocarbon accumulations of significant size in the Middle Jurassic. Secondary objectives were hydrocarbon accumulations in the Early Jurassic sandstone. The well should also verify the geophysical and structural interpretation and improve the geological, paleontological and geochemical understanding of the area. Total depth was to be in rocks of Triassic age or 4000 m in order to satisfy the licence commitment.

Operations and results

Well 6406/3-2 was spudded with the semi-submersible installation West Vanguard on 28 June 1986 and drilled to TD at 4523 m in the Early Jurassic Åre Formation. The well was drilled practically vertical down to the deepest survey point at 4261 m (4260 m TVD). In the testing phase 543.5 hrs were spent on fishing to get the cement stinger loose. The well was drilled with spud mud down to 965 m, with gypsum/polymer mud from 965 m to 2301 m, with gypsum lignosulphonate mud from 2301 m to 3930 m, and with lignosulphonate mud from 3930 m to TD.

The Middle Jurassic sandstones (Garn Formation) were penetrated at 3930 m and were found to be HC-bearing. The oil contact, probably and oil-down-to contact, was found from geochemical methods at approximately 4030 m. The logs indicated that the oil/water contact was at 4335 m. Oil shows were recorded in several intervals below this depth throughout down to TD. RFT data indicated that both Ile and Ti1je Formations were impermeable.

A total of 285 m core was recovered in 17 cores from the Garn, Not, Ile, Ror, and Tilje formations. No fluid samples were taken on wire line.

The well was permanently abandoned on 22 November 1986 as an oil discovery.

Testing

Two drill stem tests were performed in the well. DST 1 tested the interval 4302 - 4336 m in the Tilje Formati

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/863, documented in the API reference.