NORWAY · WELLBORES · NPDID 8659

2/8-G-10 A

Development · Observation · Plugged · Not applicable · Aker BP ASA · Valhall · PL 006 B

2/8-G-10 A is an observation development wellbore in the North Sea, drilled by Aker BP ASA, entered Feb 7, 2019, to 1,821 m.

Discovery 2/8-6 Valhall · On the map →

1,821
m total depth · 1,821 m vertical
73.7
m water depth
Feb 7, 2019
entered · completed Mar 9, 2019
—
at total depth
162.7
m of core in 9 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED MAR 9, 2021

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
VALHALL IP · Jacket 4 legs
Drilling days
31
Kelly bushing elevation
65.3 m
Maximum inclination
—°
Drilling permit
4757-P
Licensing round
1-A
Plugged and abandoned
Mar 9, 2019
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.27652° N, 3.39634° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/8659, documented in the API reference.