NORWAY · WELLBORES · NPDID 8704
16/5-8 S
Exploration · Wildcat · P&A · Oil · Lundin Norway AS · PL 815
16/5-8 S is a wildcat exploration wellbore in the North Sea, drilled by Lundin Norway AS, entered Jul 8, 2019, to 2,468 m.
Discovery 16/5-8 S (Goddo) · On the map →
- 2,468
- m total depth · 2,093 m vertical
- 104
- m water depth
- Jul 8, 2019
- entered · completed Aug 22, 2019
- —
- at total depth
- 36.6
- m of core in 5 cores
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED AUG 22, 2021
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- LEIV EIRIKSSON · Semisub steel
- Drilling days
- 46
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 0°
- Drilling permit
- 1755-L
- Licensing round
- TFO2015
- Plugged and abandoned
- Aug 22, 2019
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.72703° N, 2.35325° E
- Hydrocarbons in
- Basement
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 16/5-8 S was drilled to test the Goddo prospect on the Utsira High in the North Sea. The primary objective was to prove hydrocarbons in porous/fractured basement below base Cretaceous and to verify pressure communication with the nearby Rolvsnes discovery.
Operations and results
Wildcat well 16/5-8 S was spudded with the semi-submersible installation Leiv Eiriksson on 8 July 2019 and drilled to TD at 2468 m (2093 m TVD) 268 m into granitic Basement rock. No shallow gas was identified in the site survey or while drilling the well. Operations proceeded without significant problems. The well was drilled with seawater and hi-vis pills down to 196 m, with KCl/polymer mud from 196 m to 620 m, and with BaraHib ECO water-based mud from 620 m to TD.
Top Basement was penetrated at 2201.7 m (1889.4 m TVD), underlying Valanginian age Åsgard Fm marls. The basement is porous and fractured with a ca 20-25 m oil column. Pressure data shows that the Goddo discovery is not in pressure communication with the Rolvsnes oil discovery. There were no oil shows outside of the hydrocarbon bearing fractured basement zone in the well.
Five continuous cores were cut in the interval 2192 to 2229.8 m. Recovery was 99 to 100% for all cores except core no 2 from 2201 to 2206 m, which had a recovery of 79.2%. The average core to log shift is estimated to +2.03 m with +1.76 m at the BCU /top Basement level in core no 1. Wire line FTNG fluid samples were taken at 2202.64 m (oil), 2205.38 m (oil), 2205.71 m (oil), 2246.16 m (water), and 2251.46 m (water). PVT analysis of the oil samples gave GOR around 150 Sm3/Sm3 and an oil density of ca 0.872 g/cm3.
The
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/8704, documented in the API reference.