NORWAY · WELLBORES · NPDID 8874

32/4-2

Exploration · Wildcat · Junked · Not applicable · Equinor Energy AS · PL 921

1 document: reports, logs, and plots →

32/4-2 is a wildcat exploration wellbore in the North Sea, drilled by Equinor Energy AS, entered Sep 9, 2019, to 1,184 m.

On the map →

1,184
m total depth · 1,184 m vertical
292
m water depth
Sep 9, 2019
entered · completed Sep 21, 2019
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED APR 1, 2020

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST HERCULES · Semisub steel
Drilling days
13
Kelly bushing elevation
31 m
Maximum inclination
0°
Drilling permit
1784-L
Licensing round
TFO2017
Plugged and abandoned
Sep 21, 2019
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.51038° N, 4.15501° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 32/4-2 was drilled to test the Gladsheim prospect on the Horda Platform in the Stord Basin Area. The prospect is located approximately 25 km east of Troll East and 30 km from shore. The primary objective was to prove oil migration into the Sognefjord Formation and establish the corresponding fluid contacts. Secondary objective was to test the gas potential in Mid- and Lower Jurassic Brent Group, Johansen Formation and Statfjord Group. A tertiary objective was to verify Late Jurassic shales sealing capacity and acquire data to confirm CO2 storage potential and to extend the well into the Lunde Formation for this reason

Operations and results

Wildcat well 32/4-2 was spudded with the semi-submersible installation West Hercules on 9 September 2019 and drilled vertically with two hole sections: 32”x42” and 17 ½’’. These sections were drilled with seawater and returns to seabed. After running the 20 x 13 3/8” casing, gas bubbles were observed flowing from LPWHH circulation ports. The shallow hazard evaluation had given a shallow gas Class 0, so shallow gas was not expected at the well location. Neither was shallow water flow. Gas samples were taken. A 13 3/8" casing cement bond log and an acoustic log were performed on wireline from respectively 1130 m to seabed, and 767 m to 320 m. The BOP was run and pressure tested to 183 bar for 60 minutes against the 13 3/8" casing. Mud/water forming craters on the seabed was observed around the wellhead. The

decision was made to pull the BOP and the riser and to abort further operations on this well. TD was thus set at 1185 m in the Late Jurassic Draupne Formation.

Due to the unexpected shallow gas and water flow the well was te

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/8874, documented in the API reference.