NORWAY · WELLBORES · NPDID 9062

16/1-33 S

Exploration · Wildcat · P&A · Dry · Spirit Energy Norway AS · PL 780

16/1-33 S is a wildcat exploration wellbore in the North Sea, drilled by Spirit Energy Norway AS, entered Jul 10, 2020, to 3,158 m in the Skagerrak Fm.

On the map →

3,158
m total depth · 3,067 m vertical
116
m water depth
Jul 10, 2020
entered · completed Aug 5, 2020
Skagerrak Fm
at total depth · Late Triassic
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED SEP 24, 2021

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
LEIV EIRIKSSON · Semisub steel
Drilling days
27
Kelly bushing elevation
25 m
Maximum inclination
0°
Drilling permit
1822-L
Licensing round
TFO2014
Plugged and abandoned
Aug 5, 2020
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.97859° N, 2.17521° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 16/1-33 S was drilled to test the Sørvesten prospect on the Gudrun Terrace west of the Utsira High in the North Sea. The primary objective was to test the hydrocarbon potential in the Middle Jurassic Sleipner Formation and the Triassic Skagerrak Formation.

Operations and results

Wildcat well 16/1-33 S was spudded with the semi-submersible installation Leiv Eiriksson on 10 July 2020 by tagging seabed with the 9 7/8" pilot hole BHA. The shallow gas pilot hole was drilled to 555 m, 5 m deeper than the planned setting depth for the 20" surface casing. No shallow gas was encountered. Drilling proceeded to final TD at 3158 m (3066.8 m TVD) m in the Late Triassic Skagerrak Formation. Operations proceeded without significant problems. The well was drilled with seawater and hi-vis pills down to 553 m and with Rheguard oil-based mud from 553 m to TD.

No hydrocarbons were encountered in any formation. Seven pressure points were taken with Stethoscope LWD tool on the way out of hole, proving a hydrostatic pressure slightly depleted compared to the regional pressure regime. Apart from some fluorescence in traces of sand in the Draupne and Heather formations there were no shows in the well.

No cores were cut, no wireline runs were made, and no fluid sample was taken.

The well was permanently abandoned on 6 August 2020 as a dry well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages → · Press release →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.