NORWAY · WELLBORES · NPDID 908

30/9-B-25

Development · Injection · Closed · Gas · Norsk Hydro Produksjon AS · Oseberg · PL 079

30/9-B-25 is an injection development wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered May 19, 1986, to 3,920 m.

Discovery 30/6-1 Oseberg · On the map →

3,920
m total depth · 3,920 m vertical
109
m water depth
May 19, 1986
entered · completed Jul 3, 1986
—
at total depth · Early Jurassic
63.6
m of core in 2 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JUL 3, 1988

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
VILDKAT EXPLORER · Semisub steel
Drilling days
46
Kelly bushing elevation
24 m
Maximum inclination
—°
Drilling permit
354-P
Licensing round
Awarded additionally to round 6
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.49335° N, 2.82846° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.