NORWAY · WELLBORES · NPDID 9352

9/2-C-7 A

Development · Injection · Injecting · Water/gas · Repsol Norge AS · Yme · PL 316

9/2-C-7 A is an injection development wellbore in the North Sea, drilled by Repsol Norge AS, entered Dec 1, 2023, to 6,310 m.

Discovery 9/2-1 Yme · On the map →

6,310
m total depth · 3,318.1 m vertical
93
m water depth
Dec 1, 2023
entered · completed Feb 28, 2024
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 21, 2026 · RELEASED FEB 28, 2026

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
INSPIRER · Jack-up 3 legs
Drilling days
90
Kelly bushing elevation
56.2 m
Maximum inclination
—°
Drilling permit
5264-P
Licensing round
18
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
57.81605° N, 4.53544° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/9352, documented in the API reference.