NORWAY · WELLBORES · NPDID 937

30/9-2 R

Exploration · Appraisal · P&A · Oil/gas · Norsk Hydro Produksjon AS · Oseberg · PL 079

2 documents: reports, logs, and plots →

30/9-2 R is an appraisal exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jun 1, 1986, to 2,830 m in the Drake Fm.

Discovery 30/6-9 · On the map →

2,830
m total depth · 2,830 m vertical
105
m water depth
Jun 1, 1986
entered · completed Jul 7, 1986
Drake Fm
at total depth · Early Jurassic
—
m of core
107
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JUL 7, 1988

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TREASURE HUNTER · Semisub steel
Drilling days
38
Kelly bushing elevation
25 m
Maximum inclination
12°
Drilling permit
370-L2
Licensing round
Awarded additionally to round 6
Plugged and abandoned
Jul 7, 1986
Core samples available
No
Cuttings samples available
No
Position · ED50
60.46472° N, 2.82029° E
Hydrocarbons in
Brent Gp · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The wildcat 30/9-2 was planned as the first well on the Gamma structure in block 30/9. Well 30/6-9 had previously penetrated the structure but this well failed to encounter the oil/water contact. The primary objectives of 30/9-2 were to verify the reserve estimate for the main part of the gamma structure and penetrate the oil/water contact in the lower part of the Brent Group. Additional objectives were to obtain core material from the oil zone in the Etive Formation and perform a water injection test in this, obtain information on the quality of the reservoir in the water zone and stratigraphical information on the southern part of the Gamma structure.& The well was temporarily abandoned for about one year and then re-entered for an extended test.

Operations and results

Wildcat well 30/9-2 was spudded with the semi-submersible installation "Nortrym" on 1 April 1983 and drilled to a total depth of 2830 m in the Early Jurassic Dunlin Group. The well was drilled using water-based mud down to the 12 1/4" hole at 1715 m. The 12 1/4" hole was drilled to TD using oil based mud ("ENVIROMUL" and "IL 2832 oil" as oil base). While running the 13 3/8" casing, this got stuck at 1334 m. The casing was worked free using diesel in the mud and the casing was set at 1680 m. After drilling the 12 1/4" hole to 2203 m the drill pipe got stuck with the bit at 2170 m. Several unsuccessful attempts were made to free the pipe. The drill pipe was then backed off and the well was cemented back and sidetracked from 1482.5 m.

The Brent Group sandstones (2578-2767 m) RKB were hydrocarbon bearing down to 2737m where an oil/water contact was encountered within the Etive Formation sandstones (2698-2767m).& No additional hydrocarbon bearing reservoirs were encountered by this well. Poor hydrocarbon shows reported from Upper Cretaceous limestones were considered uninteresting. The Ness Formation (2578-2698 m) consisted of

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/937, documented in the API reference.