NORWAY · WELLBORES · NPDID 949

6406/3-3

Exploration · Appraisal · P&A · Shows · Den norske stats oljeselskap a.s · Åsgard · PL 091

8 documents: reports, logs, and plots →

6406/3-3 is an appraisal exploration wellbore in the Norwegian Sea, drilled by Den norske stats oljeselskap a.s, entered Aug 4, 1986, to 4,416 m in the Åre Fm.

Discovery 6506/12-3 Smørbukk Sør · On the map →

4,416
m total depth · 4,416 m vertical
302
m water depth
Aug 4, 1986
entered · completed Oct 26, 1986
Åre Fm
at total depth · Early Jurassic
30.7
m of core in 2 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED OCT 26, 1988

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DYVI DELTA · Semisub steel
Drilling days
84
Kelly bushing elevation
29 m
Maximum inclination
0°
Drilling permit
526-L
Licensing round
8
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
64.99699° N, 6.89101° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6406/3-3 was drilled to appraise the southern part of the Beta structure, named Smørbukk South. This well was the fourth well on Smørbukk South, and it was a joint well between licenses PL 091 and PL 094. The primary target for the well was sandstones in the Middle-Early Jurassic age Halten Group (present nomenclature: Fangst and Båt Groups). The well location was chosen so that the Tomma I Formation (Garn Formation) was expected to be hydrocarbon bearing with hydrocarbon/water contacts in the Tomma III - Aldra Formations (Ile - Tilje Formations).

Operations and results

Appraisal well 6406/3-3 was spudded with the semi-submersible installation Dyvi Delta on 4 August 1986 and drilled to TD at 4416 m in the Early Jurassic Åre Formation. Operations went without significant incidents and were finished twenty days ahead of schedule. Only 5.2% rig time was registered as down time. The well was drilled with seawater/hi-vis pills/bentonite down to 1070 m, with gypsum/polymer mud from 1070 m to 2320 m, with gypsum/lignosulphonate/lignite mud from 2320 m to 3936 m, and with lignosulphonate/lignite/Anco resin mud from 3936 m to TD.

The top of the reservoir came in at 3933 m, 49 m deeper than prognosed. Cores showed poor - medium visible porosity and good to poor oil shows from the top and down to ca 3955 m (ca 3925 m TVD MSL). The oil/water contact was thus almost 65 m higher than the other holes in the Beta structure. RFT-data indicated that the rest of the Fangst and Båt Groups contained water. Weak shows were however recorded on sidewall cores in the interval 4210 m to 4262 m in the Ti1je Formation, while weak shows were recorded on well site cuttings all through Middle - Early Jurassic down to TD.

A fixed offset VSP with the source 2.6 km north of the location was shot in order to explain the surprising and negative results of the well. The VSP sections indicated a probably sealing, east-west striking fault at reser

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/949, documented in the API reference.