NORWAY · WELLBORES · NPDID 9677

16/1-D-8 B

Development · Observation · Plugged · Not applicable · Aker BP ASA · Ivar Aasen · PL 001 B

16/1-D-8 B is an observation development wellbore in the North Sea, drilled by Aker BP ASA, entered Oct 11, 2022, to 3,472 m.

Discovery 16/1-9 Ivar Aasen · On the map →

3,472
m total depth · 2,537 m vertical
112.7
m water depth
Oct 11, 2022
entered · completed Oct 18, 2022
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED OCT 18, 2024

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
MAERSK INVINCIBLE · Jack-up 3 legs
Drilling days
8
Kelly bushing elevation
68.3 m
Maximum inclination
—°
Drilling permit
5451-P
Licensing round
1-A
Plugged and abandoned
Oct 18, 2022
Core samples available
No
Cuttings samples available
No
Position · ED50
58.92232° N, 2.19816° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/9677, documented in the API reference.