NORWAY · WELLBORES · NPDID 9684

24/9-M-5 H

Development · Production · Closed · Oil · Aker BP ASA · Bøyla · PL 340

24/9-M-5 H is a production development wellbore in the North Sea, drilled by Aker BP ASA, entered Oct 4, 2022, to 4,975 m.

Discovery 24/9-12 S (Frosk) · On the map →

4,975
m total depth · 1,819 m vertical
120
m water depth
Oct 4, 2022
entered · completed Nov 3, 2022
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 16, 2026 · RELEASED NOV 3, 2024

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
DEEPSEA NORDKAPP · Semisub steel
Drilling days
25
Kelly bushing elevation
32.7 m
Maximum inclination
—°
Drilling permit
5458-P
Licensing round
TFO2004
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
59.34211° N, 1.82791° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/9684, documented in the API reference.