NORWAY · WELLBORES · NPDID 9742

25/7-A-1 AH

Development · Observation · Plugged · Not applicable · Aker BP ASA · Alvheim · PL 203

25/7-A-1 AH is an observation development wellbore in the North Sea, drilled by Aker BP ASA, entered Jan 30, 2023, to 2,500 m.

Discovery 25/4-3 (Gekko) · On the map →

2,500
m total depth · 2,183 m vertical
124.4
m water depth
Jan 30, 2023
entered · completed Feb 5, 2023
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED FEB 5, 2025

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
DEEPSEA NORDKAPP · Semisub steel
Drilling days
7
Kelly bushing elevation
32.7 m
Maximum inclination
—°
Drilling permit
5497-P
Licensing round
15
Plugged and abandoned
Feb 5, 2023
Core samples available
No
Cuttings samples available
No
Position · ED50
59.49582° N, 2.02676° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/9742, documented in the API reference.