NORWAY · WELLBORES · NPDID 9873
1/9-AA-3 H
Development · Production · Producing · Oil/gas · ConocoPhillips Skandinavia AS · Tommeliten A · PL 044
1/9-AA-3 H is a production development wellbore in the North Sea, drilled by ConocoPhillips Skandinavia AS, entered Nov 28, 2023, to 5,062 m.
Discovery 1/9-1 Tommeliten Alpha · On the map →
- 5,062
- m total depth · 3,183 m vertical
- 75.1
- m water depth
- Nov 28, 2023
- entered · completed Dec 21, 2023
- —
- at total depth
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED OCT 27, 2026 · RELEASED DEC 21, 2025
On file for this wellbore
Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.
Drilling
- Drilling facility
- LINUS · Jack-up 3 legs
- Drilling days
- 24
- Kelly bushing elevation
- 58.4 m
- Maximum inclination
- —°
- Drilling permit
- 5554-P
- Licensing round
- 3
- Plugged and abandoned
- —
- Core samples available
- No
- Cuttings samples available
- No
- Position · ED50
- 56.42054° N, 2.90252° E
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/9873, documented in the API reference.