NORWAY · WELLBORES · NPDID 9958

25/5-H-1 H

Development · Observation · Plugged · Oil · Aker BP ASA · Tyrving · PL 102 G

25/5-H-1 H is an observation development wellbore in the North Sea, drilled by Aker BP ASA, entered Jan 19, 2024, to 2,724 m.

Discovery 25/5-9 (Trell) · On the map →

2,724
m total depth · 2,347.7 m vertical
119
m water depth
Jan 19, 2024
entered · completed Jan 24, 2024
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JAN 24, 2026

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
DEEPSEA NORDKAPP · Semisub steel
Drilling days
6
Kelly bushing elevation
32.7 m
Maximum inclination
—°
Drilling permit
5593-P
Licensing round
9
Plugged and abandoned
Jan 24, 2024
Core samples available
No
Cuttings samples available
No
Position · ED50
59.62800° N, 2.43817° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/9958, documented in the API reference.