OPERATORS · TEXAS · P-5 NUMBER 426412
Iron Orchard Operating LLC
Current operator per the RRC wellbore schedule, which is where transfers land. Acquired wells are marked. About the file →
12 WELLS · PAGE 1 OF 1 · BY COMPLETION DATE
| API | Lease / well | County | Field | Type | Completed | Depth | Origin |
|---|---|---|---|---|---|---|---|
| 47538854 | Flying Fortress 98 #1D | Ward | Abraxas (Cherry Canyon) | InjectionSCHED | Jan 17, 2026 | — | Own permit |
| 47538962 | Flying Fortress 98-83 #— | Ward | Phantom (Wolfcamp) | ProducingSCHED | Dec 26, 2025 | — | Own permit |
| 47538960 | Flying Fortress 98-83 #— | Ward | Phantom (Wolfcamp) | ProducingSCHED | Dec 21, 2025 | — | Own permit |
| 38341975 | UL Tenth Cavalry B 7-6 #501UH | Reagan | Spraberry (Trend Area) | ProducingSCHED | Jul 1, 2025 | — | Own permit |
| 38341978 | UL Tenth Cavalry C 7-6 #502LH | Reagan | Spraberry (Trend Area) | ProducingSCHED | Jul 1, 2025 | — | Own permit |
| 38341974 | UL Tenth Cavalry a 7-6 #401AH | Reagan | Spraberry (Trend Area) | ProducingSCHED | Jun 20, 2025 | — | Own permit |
| 47538748 | Flying Fortress 98-83 #301H | Ward | Phantom (Wolfcamp) | ProducingSCHED | Aug 7, 2024 | — | Own permit |
| 47538749 | Flying Fortress 98-83 #401H | Ward | Phantom (Wolfcamp) | ProducingSCHED | Aug 7, 2024 | — | Own permit |
| 47538750 | Flying Fortress 98-83 #302H | Ward | Phantom (Wolfcamp) | ProducingSCHED | Aug 4, 2024 | — | Own permit |
| 46142688 | UL the Machine a 29-32-5 #501UH | Upton | Spraberry (Trend Area) | ProducingSCHED | May 5, 2024 | — | Own permit |
| 46142689 | UL the Machine B 29-32-5 #502UH | Upton | Spraberry (Trend Area) | ProducingSCHED | May 5, 2024 | — | Own permit |
| 46137029 | University 4-29C #1 | Upton | Sheep Mountain (Consolidated) | Shut INSCHED | Jul 18, 2011 | — | Own permit |